Beijing RPT-3000B multifunction modified asphalt equipment
Project: April 2010
Project Area: 8000 m2
Equipment Location: Beijing
Highlights: 1, the integration of modified asphalt equipment for utility model patents
Use to produce SBS modified asphalt, crumb rubber modified asphalt and a variety of high-viscosity modified asphalt
3, easy operation, low management costs
The family of devices equipped with two independent heating system, and effective way to avoid schedule delays due to equipment failure
- prev:Zhongjiang Highw
- next:Fuyin Highway G7